六六字典>英语词典>contract bridge翻译和用法

contract bridge

英 [ˌkɒntrækt ˈbrɪdʒ]

美 [ˌkɑːntrækt ˈbrɪdʒ]

n.  定约桥牌(桥牌游戏的标准形式,只能按叫到的定约取得成局奖分)

牛津词典

    noun

    • 定约桥牌(桥牌游戏的标准形式,只能按叫到的定约取得成局奖分)
      the standard form of the card game bridge , in which points are given only for sets of cards that are bid and won

      英英释义

      noun

      • a variety of bridge in which the bidder receives points toward game only for the number of tricks he bid
          Synonym:contract

        双语例句

        • The French international is being coveted by Milan after it became clear that talks over extending his contract at Stamford Bridge had broken down.
          在加拉与切尔西续约谈判破裂情况明朗的前提下,米兰就一直对该法国国脚穷追不舍。
        • The company has won the contract to construct the new bridge.
          这家公司赢得了建造这座新桥的合同。
        • Through summary to the construction of Contract 19 Section box arch bridge along Dali-Baoshan Highway, this paper briefly introduces the hoisting method and monitoring control measures of this bridge.
          文章通过对大(理)保(山)高速公路19合同段箱形拱桥的施工总结,简要介绍该桥的吊装方法及监控措施。
        • Several companies are bidding for the contract to build the bridge.
          有几家公司正在投标争取承包建桥工程。
        • Striker Hernan Crespo has officially left Chelsea after the Argentine's contract at Stamford Bridge expired.
          射手赫尔南·克雷斯波与切尔西的合同到期,并正式离开切尔西了。
        • The purpose of concluding the contract to become a bridge between fundamental breach and the termination of the contract, it also determines the inevitable joint.
          缔结合同的目的成为根本违约与合同解除之间的桥梁,它也决定了二者的必然联合。
        • William gallas, who is out of contract next year, also wants to quit Stamford Bridge and has fallen out with Mourinho after reporting late for pre-season.
          明年合同到期的加拉,一心想离开蓝军,在最近发表个人想法后,已经被老穆放弃。
        • The distribution of shallow-buried gas in the Contract Section is introduced and its influence on bridge construction is analyzed. Intended pre-construction gas release through geological drilling and corresponding measures to solved the problems caused by the gas are discussed.
          简述合同段内浅层气的分布情况,分析浅层气对桥梁施工的影响,拟定采取的施工前地质钻孔释放措施,同时针对浅层气在桥梁钻孔桩基础施工中引发问题提出解决措施。
        • The Contract D1 of the north approach spans of the 3rd Nanjing Changjiang River Bridge is a continuous box girder structure composed of 3 continuous units, respectively 2 units of 8 spans each and 1 unit of 9 spans.
          南京长江第三大桥北引桥D1标为3联(2联8跨,1联9跨)连续箱梁。
        • Didier Drogba has yet to sign a new contract at Stamford bridge, despite the fact talks with Chelsea commenced before the start of the season.
          德罗巴依然没有获得一份斯坦福桥的新合同,尽管续约谈判在赛季初就开始了。